01.  bottom and keel in september
02.  bottom in september
03.  half the paint off the hull october
04.  paint being removed in october
05.  pretty rough planks with paint removed
06.  working undercover
07.  covered for outside work in october
08.  first freezing day in october
09.  getting down to the keel
10.  bottom and keel with paint removed aft side
11.  ugly
12.  move inside for winter work in November
13.  decemebr break outside the shop
14.  original open seams
15.  open bottom seams
16.  1 seam at a time
17.  seams cut out for splining
18.   after inserting splines with wood strips and epoxy
19.  seams being filled
20.  below waterline seams filled
21.  longboarded, faired and hanging to lamiante
22.  bottom of keel and boat from underneath
23.  front of keel sanded, faired and laminated
24.  hanging after lamination
25.  rough fitting topside splines
26.  fairing upper splines
27.  topsides longboarded
28.  getting ready for lamination
29.  port side ready for staining splines and  lamination
30.  first coat of epoxy on topsides
31.  lamianting
32.  laminating (2)
33.  wet out cloth after first coat of epoxy
34.  laminating second coat 4 hours after first coat
35.  second coat starts to fill the cloth weave
36.  second coat
37.  port side bow
38.  cloth doubled on stem from port and starboard sides
39.  stem
40.  stem
41.  port side laminated
42.  port side
43 taped off and sprayed
44  taped off and sprayed deck
45  taped off and sprayed deck 2
46 port side sprayed
47 transom and aft end sprayed
48  high gloss
49 cabin top
50 topsides taped off for bottom painting
51 before
52 after
53 after 2
54 taped off for gold stripe
55 tape removed
56 tape removed 2
57 on the trailer
58 on the traler 2